| 注册
首页|期刊导航|人民长江|三峡工程巨型水轮发电机组技术进步

三峡工程巨型水轮发电机组技术进步

袁达夫 邵建雄 刘景旺

人民长江Issue(19):18-25,8.
人民长江Issue(19):18-25,8.DOI:10.16232/j.cnki.1001-4179.2015.19.007

三峡工程巨型水轮发电机组技术进步

Advance of giant hydrogenerator technology of Three Gorges Project

袁达夫 1邵建雄 2刘景旺2

作者信息

  • 1. 长江勘测规划设计研究院,湖北 武汉430010
  • 2. 长江勘测规划设计研究有限责任公司 机电设计处,湖北 武汉430010
  • 折叠

摘要

Abstract

The operation condition of 700MW hydrogenerators of Three Gorges Project is the most difficult among the same kinds of units, which brings great challenge to its stable operation. Aiming at the design of the units, we had carried out a series of systematic researches, including relative parameters to the safe and stable operation, optimal match of performance parameters, stable operation measures as well as application of new technologies. The research results had been applied in the design, manu-facture of unit and operation of plant, and a series of problems of giant hydrogenerator had been solved such as excessive hydrau-lic pulsation at high load area, safe and stable operation under large fluctuation of water head.

关键词

机组冷却技术/安全稳定运行/巨型水轮发电机组/三峡工程

Key words

cooling technology of hydrogenerator/safe and stable operation/hydrogenerator units/Three Gorges Project

分类

建筑与水利

引用本文复制引用

袁达夫,邵建雄,刘景旺..三峡工程巨型水轮发电机组技术进步[J].人民长江,2015,(19):18-25,8.

人民长江

OA北大核心

1001-4179

访问量0
|
下载量0
段落导航相关论文