山东煤炭科技Issue(11):142-143,2.DOI:10.3969/j.issn.1005-2801.2015.11.064
双线双钩提升设置中部错车线研究与应用
Research and application of double hook lifting is arranged in the middle of the wrong line
王波 1庞兵 1张雪亮1
作者信息
- 1. 四川川煤石洞沟煤业有限责任公司,四川广元 628209
- 折叠
摘要
Abstract
To change the single wire running state in the up and down slope section of track hidden inclined shaft using the double hook and double hoist system , proposed reduce the rail center distance to 0.9m, set the central passing track line, the scheme met the mine safety and efifcient, economic promotion and achieved good results.关键词
双线双钩/中部错车线/斜巷提升Key words
double hook and double/Central passing track line/the inclined shaft hoisting分类
矿业与冶金引用本文复制引用