| 注册
首页|期刊导航|水利水电科技进展|标准U形过水断面渠槽临界水深的简化计算公式

标准U形过水断面渠槽临界水深的简化计算公式

滕凯

水利水电科技进展Issue(4):46-48,3.
水利水电科技进展Issue(4):46-48,3.DOI:10.3880/j.issn.10067647.2013.04.011

标准U形过水断面渠槽临界水深的简化计算公式

A simplified formula of critical depth of the open channel with standard U-shaped cross-section

滕凯1

作者信息

  • 1. 齐齐哈尔市水务局,黑龙江 齐齐哈尔 161006
  • 折叠

摘要

Abstract

  The calculation of critical depth of the open channel with a standard U-shaped cross-section is difficult because of its complicated formula. In order to solve this problem, a simplified formula of the critical depth was derived by using the optimized fitting method and taking minimal standard residual difference as an objective function. The simplified formula meets the engineering requirement, and its calculation has the advantages of simple, fast, and high accuracy.

关键词

U形过水断面/临界水深/优化拟合/近似计算

Key words

U-shaped cross-section/critical depth/optimized fitting/approximate calculation

分类

建筑与水利

引用本文复制引用

滕凯..标准U形过水断面渠槽临界水深的简化计算公式[J].水利水电科技进展,2013,(4):46-48,3.

水利水电科技进展

OA北大核心CSCDCSTPCD

1006-7647

访问量0
|
下载量0
段落导航相关论文