小湾特高拱坝首蓄期坝体变形特性分析及评价OA北大核心CSCDCSTPCD
Deformation analysis and safety evaluation of Xiaowan ultra-high arch dam during first impoundment
针对小湾特高拱坝首次蓄水期坝体变形备受关注的几个焦点问题,运用综合过程线对比、数学建模、数值仿真、数理统计分析等定性和定量方法进行分析,结果表明:小湾大坝坝体蓄水早期向上游方向倾斜(主要与库盘下沉有关),库水位是首蓄期坝体变形的最主要影响因素,坝体时效变形已趋于收敛。通过将数值仿真成果与实测值比较、模型分析与实测值比较、设计预警指标与实测值比较、小湾工程与同类工程实测值比较,认为小湾水电站特高拱坝经受了正常蓄水位工况下的综合考验,尽管变形量值较大…查看全部>>
In consideration of some key problems relating to the deformation of the Xiaowan Arch Dam during the first impoundment, the deformation was analyzed with qualitative and quantitative methods, including comprehensive hydrograph analysis, model analysis, numerical simulation, and mathematical statistics. The results show that the dam inclined upstream in the early stage of reservoir impoundment, mainly due to the sinking of the reservoir basin. The reservoir w…查看全部>>
胡波;刘观标;吴中如
国网电力科学研究院南京南瑞集团公司,江苏 南京 210003 河海大学水文水资源与水利工程科学国家重点实验室,江苏 南京 210098国网电力科学研究院南京南瑞集团公司,江苏 南京 210003
建筑与水利
小湾大坝特高拱坝大坝变形原型监测数值仿真
Xiaowan Damultra-high arch damdam deformationprototype monitoringnumerical simulation
《水利水电科技进展》 2015 (6)
多因素协同作用下混凝土坝长效服役的理论与方法
68-72,118,6
国家自然科学基金(51139001)江苏省自然科学基金(BK2009479)江苏省博士后科研资助计划(1101049C)
评论