石油钻采工艺Issue(1):1-4,4.
永3平9跨断块阶梯水平井钻完井技术
Drilling and completion techniques of cross-block ladder horizontal wells:a case of Well Y3p9
摘要
Abstract
Yong’an block of Shengli Oilfield is a typical small complex fault block oil reservoir. In order to explore the potential of this kind of reservoir further, a cross-block ladder horizontal well is used on the basis of recognizing faults, and the remaining oil in dif-ferent faults is produced by one well. By this method, the recovery is improved and the drilling cost is decreased. The paper analyzes the reservoir characteristics of Yong’an block and illustrates the difficulties for drilling and completion of this well, on the basis of which it introduces the drilling and completion techniques of the first cross-block ladder horizontal well of Shengli Oilfield, Well Y3p9. Geosteer-ing technique and seismic cross section are combined to determine the fault location and to accurately control the well trajectory to pass through faults and dig into another oil layer. Drilling and completion integrated technique and plastic micro-expansion slurry are taken to greatly increase the cementing quality of ladder horizontal wells. This well has been successfully drilled and produced, which proves the cross-block ladder horizontal well can improve the recovery ratio of fault block reservoir, and has promotional value.关键词
跨断块/阶梯水平井/钻完井技术/永3平9井Key words
cross-block/ladder horizontal well/drilling and completion techniques/Well Y3p9分类
能源科技引用本文复制引用
刘成贵,许军富,徐云龙..永3平9跨断块阶梯水平井钻完井技术[J].石油钻采工艺,2013,(1):1-4,4.基金项目
国家科技重大专项“断块油田特高含水期提高水驱采收率技术”(编号:2011ZX05011-003)资助 (编号:2011ZX05011-003)