铁道标准设计Issue(12):40-44,5.DOI:10.13238/j.issn.1004-2954.2015.12.010
东平水道特大桥(85+286+85)m双拱肋钢桁拱设计
Design of Dongping Waterway Grand Railway Bridge with (85+286+85) m-span Steel Trussed Arch and Double Arch Ribs
张文华1
作者信息
- 1. 中铁第四勘察设计院集团有限公司,武汉 430063
- 折叠
摘要
Abstract
The main bridge of Dongping grand railway bridge is a ( 85+286+85 ) m-span with double arch rib connected by steel truss arch bridge. The upper arch rib of the main bridge extends to the side pier bearings and the lower arch rib is supported on the middle piers. The upper and the lower arch ribs are connected by truss structures. The side spans of the main bridge are arch structures, which support bridge deck system with arch columns. The ratio of side span to middle span is only 0. 3. The bridge deck system is an orthotropic plate structure with horizontal K-shape supports. The bridge structure and the bridge deck system are the first application in China, which add more choices to railway bridge structure and design. The structure is well designed, simple and clear in force bearing.关键词
铁路桥/双拱肋/钢桁拱/水平K撑/桥面系/设计Key words
Railway Bridge/Double arch fib/Steel trussed arch/Horizontal K-shape support/Bridge deck System/Design分类
交通工程引用本文复制引用
张文华..东平水道特大桥(85+286+85)m双拱肋钢桁拱设计[J].铁道标准设计,2015,(12):40-44,5.