Based on the research of strata, lithology, geological structure, geostress, engineering geology, engineering design and construction organization plan, the paper analyzes the cause and mechanism of larger deformation in No. 1 cross-tunnel area of Yangjiaping tunnel on Chengdu-Lanzhou railway. The results indicate that the larger deformation in No. 1 cross-tunnel area of Yangjiaping tunnel is the end product of all such objective factors as the intricate geological structure, high geostress, weak and broken lithology and such subjective factors as adverse combination of rock structure surface along the tunnel, short distance between double track tunnels, unfavorable construction organization plan, different supporting measures between left and right lines of double track tunnel. Due to the objective and subjective factors of larger deformation in No. 1 cross-tunnel area of Yangjiaping tunnel, a mixed mechanism is presented of geotectonic stress expansion and structural surface deformation.

关键词

成兰铁路/铁路隧道/1号横洞/大变形/成因机制/探析

Key words

Chengdu-Lanzhou Railway/Railway tunnel/No. 1 cross-tunnel/Large deformation/Cause and mechanism/Analysis

分类

交通工程

引用本文复制引用

宋章,杜宇本,袁传保,王科,王彦东..兰渝铁路杨家坪隧道1号横洞工区大变形成因机制探析[J].铁道标准设计,2015,(12):79-83,5.

基金项目

铁道部科技研究开发计划(Z2012-061) (Z2012-061)

中国铁路总公司科技研究开发计划(2013G014-B) (2013G014-B)

中铁二院工程集团有限责任公司科研项目(院计划14126005(14-17))。 (院计划14126005(14-17)