煤矿瓦斯抽排立眼套管安设及水泥固井工艺探讨

董润平 胡忠义

探矿工程-岩土钻掘工程Issue(2):56-58,63,4.
探矿工程-岩土钻掘工程Issue(2):56-58,63,4.

煤矿瓦斯抽排立眼套管安设及水泥固井工艺探讨

Discussion on Casing Installation for Methane Drainage Vertical Borehole and Cementing Process in Coalmine

董润平 1胡忠义2

作者信息

  • 1. 阳煤集团基本建设工程管理部,山西阳泉045000
  • 2. 阳泉新宇岩土工程有限责任公司,山西阳泉045000
  • 折叠

摘要

Abstract

In the construction process of methane drainage vertical borehole in coalmine, the casing installation and cemen-ting are very important.By the construction practice of methane drainage vertical borehole and cementing process in Pings-hang coalmine, this article presented some lessons from the accident and summed up the experiences of casing installation and cementing for the similar projects in the future.

关键词

煤矿瓦斯抽排立眼/套管安设/水泥固井

Key words

methane drainage vertical bore/casing installation/cementing

引用本文复制引用

董润平,胡忠义..煤矿瓦斯抽排立眼套管安设及水泥固井工艺探讨[J].探矿工程-岩土钻掘工程,2013,(2):56-58,63,4.