| 注册
首页|期刊导航|探矿工程-岩土钻掘工程|两河口水电站边坡预应力锚索超灌浆控制技术

两河口水电站边坡预应力锚索超灌浆控制技术

黄辉 施召云

探矿工程-岩土钻掘工程Issue(3):75-77,3.
探矿工程-岩土钻掘工程Issue(3):75-77,3.

两河口水电站边坡预应力锚索超灌浆控制技术

Pre-stressed Anchor Super-Grouting Control Technique in Lianghekou Hydropower Station

黄辉 1施召云1

作者信息

  • 1. 雅砻江流域水电开发有限公司两河口建设管理局,四川雅江627450
  • 折叠

摘要

Abstract

The local geological conditions are strong weathered, strong unloading anti-dip thin layer-middle-thick layer sand slate with joints and fractures developing, broken surrounding rocks, open fissures and serious loose unloading in road slope excavation at Lianghekou hydropower station.The frame beams and non-cohesive steel strand dispersion-type pre-stressed anchorage cable were designed to reinforce the side slope.The paper describes the super grouting control technique for pre-stressed anchor grouting in poor geological conditions.

关键词

边坡支护/预应力锚索/超灌浆/控制技术/两河口水电站

Key words

slope support/pre-stressed anchor cable/super grouting/control technique/Lianghekou hydropower station

分类

地质学

引用本文复制引用

黄辉,施召云..两河口水电站边坡预应力锚索超灌浆控制技术[J].探矿工程-岩土钻掘工程,2013,(3):75-77,3.

探矿工程-岩土钻掘工程

2096-9686

访问量0
|
下载量0
段落导航相关论文