| 注册
首页|期刊导航|探矿工程-岩土钻掘工程|汶川地震断裂带科学钻探项目中取心钻进方法应用的演变

汶川地震断裂带科学钻探项目中取心钻进方法应用的演变

张伟 樊腊生 吴金生

探矿工程-岩土钻掘工程Issue(7):61-64,68,5.
探矿工程-岩土钻掘工程Issue(7):61-64,68,5.

汶川地震断裂带科学钻探项目中取心钻进方法应用的演变

The Evolution Process of the Core Drilling Methods Used in Wenchuan Earthquake Faults Scientific Drilling Pro-ject

张伟 1樊腊生 1吴金生1

作者信息

  • 1. 中国地质科学院探矿工艺研究所,四川 成都 611734
  • 折叠

摘要

Abstract

This article introduces the evolution process of the core drilling methods used in Wenchuan Earthquake Scientific Drilling Project.From PDM/hydro-hammer coring method to top-drive/wire-line coring method and finally to PDM/hydro-hammer/long split barrel coring method, the coring methods used in this project underwent a series of changes.The main reasons for these changes are formation conditions, coring technology improvement and the development.

关键词

地震/科学钻探/取心钻进/方法/汶川地震断裂带科学钻探

Key words

earthquake/scientific drilling/core drilling/method/Wenchuan earthquake faults scientific drilling

分类

地质学

引用本文复制引用

张伟,樊腊生,吴金生..汶川地震断裂带科学钻探项目中取心钻进方法应用的演变[J].探矿工程-岩土钻掘工程,2013,(7):61-64,68,5.

基金项目

科技部科技支撑计划专项“汶川地震断裂带科学钻探(WFSD)”项目之“科学钻探与科学测井”课题 ()

探矿工程-岩土钻掘工程

2096-9686

访问量0
|
下载量0
段落导航相关论文