生态环境学报Issue(4):662-665,4.
人工湿地组合工艺处理对含油含污水净化效果研究
Purification efficiency of the constructed wetland combined process for oil wastewater
摘要
Abstract
In order to elaborate the advantages of constructed wetland and membrane technology and overcomes both shortcomings, the study investigated the feasibility of treatment of oil wastewater by the constructed wetland combined process. Experiment of the process of horizontal subsurface flow constructed wetland with ultra filtration membrane for oil wastewater was carried out. The results showed that the average removal rates of TN, COD, petroleum, BOD and NH4+-N in the constructed wetland system were 66.07%, 82.98%, 73.18%, 58.99% and 55.36% respectively. When influent flow was 1.2 m3·d-1 and the operating pressures of ultrafiltration membrane(PVDF) was 0.2 MPa, the constructed wetland combined process can achieve better effect of treatment. As influent TN, COD, petroleum, BOD and NH4+-N were 9.59, 270.80, 1.99, 14.59 and 4.40 mg·L-1, respectively, the effluent were 3.23, 46.02, 0.53, 5.97 and 1.96 mg·L-1, respectively. According to China Standard for Surface Water Resources (GB3838-2002), mean effluent TN and COD and petroleum can nearly reach Grade V, Grade V and Grade IV, and BOD and NH4+-N can reach Grade IV, respectively. In addition, seasonal variation analysis showed that purification efficiency of the constructed wetland combined process was the best in summer. The purification efficiency is better in spring than in autumn. Moreover, wetland plant plays an important role in treatment process.关键词
人工湿地组合工艺/含油污水/净化效果/季节变化Key words
constructed wetland combined process/oil wastewater/purification efficiency/seasonal variation分类
资源环境引用本文复制引用
杨旭,张雪萍,王继富,张思冲,杨守刚,王忠良,李文亮,王晓迪..人工湿地组合工艺处理对含油含污水净化效果研究[J].生态环境学报,2013,(4):662-665,4.基金项目
黑龙江省自然基金项目(QC2009C70) (QC2009C70)