核电站DCS主从控制器切换后信号跳变的分析与解决
Analysis and solution of signal jump occurring after switching of host-slave controllers in DCS of nuclear power station
程保华 1张合厂 1熊科 1曲东良2
作者信息
- 1. 中广核工程有限公司,广东 深圳 518124
- 2. 北京广利核系统工程有限公司,北京 100094
- 折叠
摘要
Abstract
In order to solve the problem that signal jump of DCS controller in the process of incremental downloading and after switching of host⁃slave controllers,an in⁃depth research was made for the hot standby redundancy,incremental downloading, host⁃slave switching mechanism and logic configuration within DCS. The study show that the irregular logic configuration under DCS controller incremental downloading mechanism made the controller unable to keep the state of part signals after host⁃slave switching. After a thorough investigation and resolution,the signal jump risk of the DCS controller was eliminated.关键词
核电站/DCS/控制器/主从切换/信号跳变Key words
nuclear power plant/DCS/controller/host-slave switching/signal jump分类
信息技术与安全科学引用本文复制引用
程保华,张合厂,熊科,曲东良..核电站DCS主从控制器切换后信号跳变的分析与解决[J].现代电子技术,2015,(19):140-142,3.