一起电缆头故障引起的孤网运行事故的分析和探讨
Analysis and Discussion of an Isolated Grid Accident Caused by Cable Head Failure
曾文清1
作者信息
- 1. 马鞍山钢铁股份有限公司能源总厂,安徽马鞍山 243000
- 折叠
摘要
Abstract
A 35 kV side cable head failure of the 220 kV main transformer is intro-duced. The causes of the failure and preventive measures are analyzed while the isolated power grid operation accident caused by the failure are also analyzed and discussed. Control measures and principle of coping for isolated grid operation in enterprise power supply system are put forward.关键词
电缆头/故障/孤网运行/分析/应对措施Key words
cable head/failure/isolated grid operation/analysis/countermeasures分类