景洪水电站高坝通航设施方案比选研究

朱国金 谢思思 凌云 刘金堂

云南水力发电Issue(5):58-60,66,4.
云南水力发电Issue(5):58-60,66,4.DOI:10.3969/j.issn.1006-3951.2015.05.017

景洪水电站高坝通航设施方案比选研究

Study on the Selection of the High Dam Navigation Facilities of Jinghong Hydropower Station

朱国金 1谢思思 1凌云 1刘金堂1

作者信息

  • 1. 中国电建集团昆明勘测设计研究院有限公司,云南 昆明 650005
  • 折叠

摘要

Abstract

A deep comparative study of adaptability and superiority of wire rope type, rack climbing type and hydraulic drive type ship lifts was made in terms of civil structure, mechanical and electrical equipment, system security and economic indicators for Jinghong Hydropower Station. The results show that the hydraulic drive type ship lift, which is considered as the fully new high dam navigation facilities, has completely solved the security problem of a ship lift in extraordinary emergencies such as water leakage and has incomparable essential safety characters, furthermore it is the most economical ship lift, enjoying signifi cant superiority over either of the other two ship lifts for the dam navigation of Jinghong Hydropower Station.

关键词

高坝通航设施/景洪水电站/方案比选/水力式升船机

Key words

high dam navigation facilities/Jinghong Hydropower Station/case study/hydraulic drive ship lift