摘要

Abstract

The main problem for deep-water sheet-pile wharf is how to deal with the earth pressures acting on the front wall, which dramatically increase with the excavation depth. The design idea of the barrier-pile structure is as follows: a row of barrier piles are constructed in front of the traditional sheep-pile wharf, and part of the earth pressures acting on the front wall are shared owing to their barrio effects so as to reach the condition for building large deep-water sheet-pile wharf. Using the developed analysis software for soil-structure interaction based on ABAQUS, the NHRI double-yield face elastoplastic constitutive model is employed to simulate stress-strain relation of soils. The constitutive model based on contact mechanics is used to simulate soil-wharf interaction. The mechanism and effect of barrier piles are studied, the distribution rules of earth pressures at the two sides of the front wall of the sheet-pile wharf with barrier piles are discussed as well as its deformation and distribution of bending moment. By comparing with the sheet-pile wharf with single anchorage, the deep-water sheet-pile wharf with barrier piles is validated.

关键词

板桩码头/遮帘桩/数值模拟/土压力

Key words

sheet-pile wharf/barrier pile/numerical simulation/earth pressure

分类

建筑与水利

引用本文复制引用

蔡正银,侯伟,关云飞..遮帘式板桩码头的工作机理[J].岩土工程学报,2015,37(10):1745-1750,6.

基金项目

国家高技术研究发展计划("863"计划)课题项目(2012AA112510) ("863"计划)