| 注册
首页|期刊导航|岩土工程学报|紫坪铺大坝下游坝坡震后抗震加固措施大型振动台模型试验研究

紫坪铺大坝下游坝坡震后抗震加固措施大型振动台模型试验研究

杨正权 赵剑明 刘小生 周国斌 刘启旺

岩土工程学报2015,Vol.37Issue(11):2058-2066,9.
岩土工程学报2015,Vol.37Issue(11):2058-2066,9.DOI:10.11779/CJGE201511017

紫坪铺大坝下游坝坡震后抗震加固措施大型振动台模型试验研究

Large-scale shaking model tests on anti-seismic and reinforcing measures for slope of Zipingpu earth-rock fill dam after"5.12" Wenchuan Earthquake

杨正权 1赵剑明 2刘小生 1周国斌 2刘启旺1

作者信息

  • 1. 流域水循环模拟与调控国家重点实验室,北京 100038
  • 2. 中国水利水电科学研究院,北京 100048
  • 折叠

摘要

Abstract

The dry masonry facing of the downstream slope of Zipingpu earth-rock fill dam was seriously destroyed during"5.12" Wenchuan Earthquake. Accordingly, the anti-seismic reinforcement for the damaged dam slope is an important task after the earthquake. The mortar masonry facing is regarded as the best choices comprehensively considering the applicability of anti-seismic and reinforcing measures for slopes of high earth-rock fill dams after earthquake proposed by worldwide engineers and its excellent anti-seismic performance in real strong earthquakes. Large-scale shaking table model tests on anti-seismic and reinforcing measures for earth-rock fill dam slope (dry masonry and mortar masonry facings) of Zipingpu earth-rock fill dam after"5.12" Wenchuan Earthquake are performed. The anti-seismic and reinforcing effect of the masonry facings is verified by the shaking model tests, and their anti-seismic and reinforcing mechanism is analyzed. Furthermore, the reinforcement area of the dam slope using the mortar masonry facing is determined based on the test results combining with the calculated results of the dam's earthquake response. The results show that the mortar masonry facing can keep its integrity wonderfully in strong earthquake, but the dry masonry facing may fail gradually because of the loosening and sliding of local stones in strong earthquakes. The protective effects of the mortar masonry facing on the dynamic stability of rock-fill dam slope in earthquake is better than the dry masonry facing obviously. The reinforcement area of the downstream slope of Zipingpu earth-rock fill dam using the mortar masonry facing after"5.12" Wenchuan Earthquake is determined to be in the dam slope area above 3/4 dam height.

关键词

紫坪铺大坝/抗震加固措施/干砌石护坡/浆砌石护坡/加固机理/加固效果

Key words

Zipingpu earth-rock fill dam/anti-seismic and reinforcing measure/dry masonry facing/mortar masonry facing/reinforcement mechanism/reinforcement effect

分类

建筑与水利

引用本文复制引用

杨正权,赵剑明,刘小生,周国斌,刘启旺..紫坪铺大坝下游坝坡震后抗震加固措施大型振动台模型试验研究[J].岩土工程学报,2015,37(11):2058-2066,9.

基金项目

国家自然科学基金项目(51509272) (51509272)

国家重点基础研究发展计划("973"计划)课题(2013CB036404) ("973"计划)

"十二五"国家科技支撑计划课题(2013BAB06B02) (2013BAB06B02)

中国水利水电科学研究院科研专项项目(岩集1467) (岩集1467)

岩土工程学报

OA北大核心CSCDCSTPCD

1000-4548

访问量0
|
下载量0
段落导航相关论文