瀑布沟水电站砾石土心墙初次蓄水期原位钻孔渗流试验研究

In-situ drilling tests of seepage in gravel soil core wall during the first impoundment in Pubugou hydropower station

胡万雨 1陈向浩 2林江 1况磊强3

作者信息

  • 1. 四川大学 水利水电学院,成都610065
  • 2. 中铁第四勘察设计院,武汉 430063
  • 3. 四川省水利水电勘测设计研究院,成都610072
  • 折叠

摘要

Abstract

At present the prototype monitoring is commonly used to know the seepage in performance period in earth-rock dam. Much research to stable seepage and there is no report about in-situ drilling tests of seepage during the first impoundment. In Pubugou hydropower station,the core-wall is such thin and not decorated with any monitoring instruments at early time above the elevation of 788.00 m. Weak areas of anti-permeability are revealed probably by the earlier monitoring, in-situ drilling tests of seepage is carried out in the core-wall during the first impoundment at 0+131and 0+434 section in August 2010. The results of the test analysis shows that, weak penetration area exists at some elevation of section 0+131and section 0+434 in the core-wall of Pubugou hydropower station. It also shows that under the necessary condition, in situ drilling tests in the core-wall during the first impoundment is practical and meaningful. The anti-permeability of fissured soil under the protection of reversed filter is suggested to be evaluated, the seepage monitoring in core-wall should be strengthened to inspect the safety of the core-wall. The experiment researches provide a reference for other gravel soil core wall of the dam design, construction, and the safety of the operation period.

关键词

土石坝/渗透试验/心墙/初次蓄水期

Key words

earth rock dam/permeability test/core wall/fisrt impoundment

分类

建筑与水利

引用本文复制引用

胡万雨,陈向浩,林江,况磊强..瀑布沟水电站砾石土心墙初次蓄水期原位钻孔渗流试验研究[J].岩土力学,2013,(5):1259-1263,1273,6.

基金项目

国家自然科学基金项目(No.51079093)。 (No.51079093)

岩土力学

OA北大核心CSCDCSTPCD

1000-7598

访问量0
|
下载量0
段落导航相关论文