600 MW超临界循环流化床锅炉关键问题研究
Key Issues and Solutions in Development of the 600MW CFB Boiler
程乐鸣 1苏虎 2许霖杰 1夏云飞 1王勤辉 1骆仲泱 1倪明江 1岑可法 1聂立 2周棋2
作者信息
- 1. 能源清洁利用国家重点实验室 浙江大学,浙江省杭州市 310027
- 2. 东方电气集团东方锅炉股份有限公司,四川省自贡市 643000
- 折叠
摘要
Abstract
The article summarized key issues studied in developing of the 600MW supercritical circulating fluidized bed (CFB) boiler at Sichuan Baima power generation plant. The issues include the solids particle mixing in dense bed and suspended heat transfer surface, gas-solids suspension density profiles in a super high riser, bed material balance and its overturn condition between a breeches-leg, gas-solids flow distribution among different cyclones, heat flux distributions on water wall, division wall and suspended heat transfer surface, thermal-hydraulic characteristics, local voidage variation with interrupting circulating loop(s) during operation, and erosion problem and protection on water wall. Solutions to the issues were suggested based on plenty of experimental and numerical study. Successful operation of the 600MW CFB boiler verifies the work.关键词
超临界/循环流化床/600 MW/白马电厂/锅炉Key words
supercritical boiler/600MW/circulating fluidized bed (CFB)/Baima power generation plant/key issues分类
能源科技引用本文复制引用
程乐鸣,苏虎,许霖杰,夏云飞,王勤辉,骆仲泱,倪明江,岑可法,聂立,周棋..600 MW超临界循环流化床锅炉关键问题研究[J].中国电机工程学报,2015,(21):5520-5532,13.