中国电机工程学报Issue(21):5682-5682,1.
Key Issues and Solutions in Development of the 600 MW CFB Boiler
Key Issues and Solutions in Development of the 600 MW CFB Boiler
CHENG Leming 1SU Hu 2XU Linjie 1XIA Yunfei 1WANG Qinhui 1LUO Zhongyang 1NI Mingjiang 1CEN Kefa 1NIE Li 2ZHOU Qi2
作者信息
- 1. Zhejiang University
- 2. Dongfang Boiler Group Co., Ltd. Zigong
- 折叠
摘要
关键词
supercritical boiler/600MW/circulating fluidized bed/Baima power generation plantKey words
supercritical boiler/600MW/circulating fluidized bed/Baima power generation plant引用本文复制引用
CHENG Leming,SU Hu,XU Linjie,XIA Yunfei,WANG Qinhui,LUO Zhongyang,NI Mingjiang,CEN Kefa,NIE Li,ZHOU Qi..Key Issues and Solutions in Development of the 600 MW CFB Boiler[J].中国电机工程学报,2015,(21):5682-5682,1.