| 注册
首页|期刊导航|中国工程科学|南京长江第四大桥上部结构施工关键技术

南京长江第四大桥上部结构施工关键技术

何超然 潘桂林 李有为

中国工程科学Issue(8):42-47,6.
中国工程科学Issue(8):42-47,6.

南京长江第四大桥上部结构施工关键技术

Key construction techniques for superstructure of the Fourth Nanjing Yangtze River Bridge

何超然 1潘桂林 1李有为1

作者信息

  • 1. 中交二航局第四工程有限公司,安徽芜湖 241007
  • 折叠

摘要

Abstract

The Fourth Nanjing Yangtze River Bridge,the longest suspension bridge in China,as well as the third one in the world,is a two-tower three-span suspension bridge with the main span of 1 418 m. The key construction techniques for the superstructure,including lifting and installation of the cable saddles,erection of the traction system,walkways and main cables,rearrangement of the main cables,installation of the suspender cables and the cable clamps,erection of the steel box girders and wrapping of the main cables,are discussed in detail in this paper. It can provide some references for the construction of the superstructures for the similar suspension bridges in the future.

关键词

南京长江第四大桥/双塔三跨悬索桥/上部结构施工/主缆架设/钢箱梁架设

Key words

the Fourth Nanjing Yangtze River Bridge/two-tower three-span suspension bridge/super-structure construction/main cable erection/steel box girder erection

分类

交通工程

引用本文复制引用

何超然,潘桂林,李有为..南京长江第四大桥上部结构施工关键技术[J].中国工程科学,2013,(8):42-47,6.

中国工程科学

OA北大核心CSTPCD

1009-1742

访问量0
|
下载量0
段落导航相关论文