| 注册
首页|期刊导航|中国资源综合利用|浅析工程设计阶段的投资控制

浅析工程设计阶段的投资控制

罗胤

中国资源综合利用Issue(6):55-57,3.
中国资源综合利用Issue(6):55-57,3.

浅析工程设计阶段的投资控制

Analysis on Investment Control of Engineering Design Stage

罗胤1

作者信息

  • 1. 北京矿冶研究总院,北京 100160
  • 折叠

摘要

Abstract

In recent years, some enterprises have taken a lot of measures to strengthen the investment control, and achieved certain results. But the excessive investments for some projects still exist. Investment control is an important part of construction project management. Proper control will reduce investment, and improve the operating economic benefit. Therefore, this paper has stated the necessity and measures of investment control focusing on the investment control of construction project in the engineering design stage. The conclusion is that the key factors of investment control are confirming the reasonable project function and investment objective, carrying the project legal person system, applying the public bidding system, and strengthening the charge management of engineering design.

关键词

工程设计阶段/投资控制

Key words

engineering design stage/investment control

分类

管理科学

引用本文复制引用

罗胤..浅析工程设计阶段的投资控制[J].中国资源综合利用,2013,(6):55-57,3.

中国资源综合利用

OACHSSCD

1008-9500

访问量0
|
下载量0
段落导航相关论文