针对嘉兴220 kV电网分区现状及存在问题,结合嘉兴电网发展规划,对嘉兴220 kV电网中期运行的分区方式进行研究分析,提出了分阶段逐步完善的分区运行方式,以适应实际电网安全可靠运行的需要。

Aiming at current status of Jiaxing 220 kV power grid partitioning and the existing problems, the paper, by combining development planning of Jiaxing power grid, investigates and analyzes medium-term par-titioning operation mode of Jiaxing 220 kV power grid, and proposes to perfect the partitioning operation mode phase by phase to adapt the actual demand of operation safety and reliability.

杨晓雷;叶琳;张静炜

嘉兴电力局,浙江 嘉兴 314033浙江电力调度控制中心,杭州 310007嘉兴电力局,浙江 嘉兴 314033

信息技术与安全科学

500 kV220 kV分区方式短路电流

500 kV220 kVpartitioning modeshort circuit current

《浙江电力》 2013 (8)

14-18,5