Abstract

By researching and investigating some typical project examples in the design of the Auxiliary Project in Beijing for the South-to-North Water Transfer Project, the applicable conditions, feature and construction period of shield tunnel was summarized.This contributed to selecting reasonable lining, ensuring project safety, economic rationality and assuring completion on schedule.After comparing several lining forms,the double composite lining with the shield tunnel lining outside and the reinforced concrete lining inside was chosen in the Auxiliary Project in Beijing for the South-to-North Water Transfer Project.

关键词

南水北调/输水隧洞/单层衬砌结构/双层衬砌结构

Key words

South-to-North Water Transfer Project/water transfer tunnel/single lining/double composite lining

分类

建筑与水利

引用本文复制引用

翟明杰,付云升,韩宇..北京南水北调配套工程隧洞衬砌结构型式分析[J].人民黄河,2015,37(12):96-98,102,4.

基金项目

北京市科委重大计划项目( D07050601510000). ( D07050601510000)

人民黄河

OA北大核心CSTPCD

1000-1379

访问量0
|
下载量0
段落导航相关论文