冶金动力Issue(1):40-43,46,5.
首钢高新产业园区燃气冷热电三联供项目建设规划探讨
Construction Planning of Combined Supply of Fuel Gas Cool and Thermal Power at Shougang Hi-tech Industrial Zone
杨旸1
作者信息
- 1. 首钢总公司园区管理部基础设施处,北京 100041
- 折叠
摘要
Abstract
Combining with domestic development situation of fuel gas turbine power generation and supply in recent years, the existing problems and shortcomings were analyzed. Faced with the historic opportunity of re-planning of Shougang New Hi-tech Industrial Zone, the feasibility of combined supply project of cool and thermal power at the zone was present-ed and the work breakthrough point and required conditions for combined power supply op-eration were put forward. Through summarizing the current restricting factors in constructing combined power supply projects in China, opinions and recommendation on the problem solu-tion were provided.关键词
燃气/冷热电三联供/能源/规划Key words
fuel gas/combined supply of cool and thermal power/energy/planning分类
信息技术与安全科学引用本文复制引用
杨旸..首钢高新产业园区燃气冷热电三联供项目建设规划探讨[J].冶金动力,2016,(1):40-43,46,5.