人民长江2015,Vol.46Issue(24):43-47,5.DOI:10.16232/j.cnki.1001-4179.2015.24.011
乌东德水电站左岸尾水出口边坡动态设计
Dynamic design of left tailrace slope of Wudongde Hydropower Plant
刘会波 1张玲丽 1张存慧 1杜申伟1
作者信息
- 1. 长江勘测规划设计研究有限责任公司,湖北 武汉 430010
- 折叠
摘要
Abstract
The tailrace outlet slope on left side of Wudongde Hydropower Plant is a typical steep consequent slope with the maximum height of 114m, and the bedding-landslide prevention is a key problem for slope excavation and support design. Slope ratio optimization and locking support reinforcement were adopted in the construction design period, however due to the complex geological conditions, the exposed rock structure greatly differed from the previous exploration results, thus dynamic reinforce-ment design was conducted. Feedback analysis was conducted for slope stability assessment and FLAC3D was employed to simu-late excavation response of rock mass under unloading condition and study the slope deformation instability mechanism and poten-tial instability modes. Also slope safety factors under different cases were calculated. The simulation results and deformation mo-nitoring indicated that the slope design of excavation and supports was rational and met the specification 's requirements and the slope was stable in general. The slope design process provides reference for similar slope projects.关键词
岩质边坡/开挖支护/动态设计/施工地质/稳定分析/乌东德水电站Key words
rocky slope/excavation support/dynamic design/construction geology/stability analysis:Wudongde Hydropower Plant分类
地质学引用本文复制引用
刘会波,张玲丽,张存慧,杜申伟..乌东德水电站左岸尾水出口边坡动态设计[J].人民长江,2015,46(24):43-47,5.