中国电力2015,Vol.48Issue(12):96-102,7.
主动配电网供电能力实时评估方法
Real-Time Evaluation for Load Capability of Active Distribution Network
摘要
关键词
分布式电源/主动配电网/供电能力/实时评估/供电瓶颈Key words
distributed generation/active distribution network/power supply capacity/real-time evaluation/power supply bottleneck分类
动力与电气工程引用本文复制引用
朱静,高亚静,刘建鹏,程华新,梁海峰,李鹏..主动配电网供电能力实时评估方法[J].中国电力,2015,48(12):96-102,7.基金项目
This work is supported by National High Technology Research and Development of China 863 Program (No.2015AA050104) (No.2015AA050104)
State Key Labcratory of Tsinghua University Power System (No.SKLD14KM02).国家863高技术基金资助项目(2015AA050104) (No.SKLD14KM02)
清华大学电力系统国家重点实验室资助项目(SKLD14KM02) (SKLD14KM02)