首页|期刊导航|机电工程技术|600MW超临界机组锅炉大板梁高空双机对抬吊装

600MW超临界机组锅炉大板梁高空双机对抬吊装

郑基彦

机电工程技术Issue(11):147-152,6.
机电工程技术Issue(11):147-152,6.DOI:10.3969/j.issn.1009-9492.2015.11.038

600MW超临界机组锅炉大板梁高空双机对抬吊装

600MW Supercritical Unit Boiler Main Girder Hoisting for Double Machine on High Altitude

郑基彦1

作者信息

  • 1. 福建省特种设备检验研究院,福建福州 350008
  • 折叠

摘要

Abstract

According to Datang 600MW unit in one power plant boiler structure and the layout of large heavy machinery, through the analysis and calculation, design of lifting lugs, design load distribution to determine the plate girder hoisting scheme, careful organization of field operations personnel, reasonable arrangement of double machine for high lift operation sequence, the stress state of real-time monitoring of double machine, effective control of double machine to carry high risk, the realization of the altitude of lift safety hoisting, accumulation of the aerial working experience.

关键词

大板梁/高空作业/双机对抬/安全/吊装

Key words

main girder/altitude work/double machine/safety/hoisting