600MW超临界机组锅炉大板梁高空双机对抬吊装
600MW Supercritical Unit Boiler Main Girder Hoisting for Double Machine on High Altitude
郑基彦1
作者信息
- 1. 福建省特种设备检验研究院,福建福州 350008
- 折叠
摘要
Abstract
According to Datang 600MW unit in one power plant boiler structure and the layout of large heavy machinery, through the analysis and calculation, design of lifting lugs, design load distribution to determine the plate girder hoisting scheme, careful organization of field operations personnel, reasonable arrangement of double machine for high lift operation sequence, the stress state of real-time monitoring of double machine, effective control of double machine to carry high risk, the realization of the altitude of lift safety hoisting, accumulation of the aerial working experience.关键词
大板梁/高空作业/双机对抬/安全/吊装Key words
main girder/altitude work/double machine/safety/hoisting分类
能源科技引用本文复制引用
郑基彦..600MW超临界机组锅炉大板梁高空双机对抬吊装[J].机电工程技术,2015,(11):147-152,6.