300MW可逆式机组背靠背启动振荡分析及对策

康永林 张成平

人民长江2016,Vol.47Issue(1):95-99,5.
人民长江2016,Vol.47Issue(1):95-99,5.DOI:10.16232/j.cnki.1001-4179.2016.01.023

300MW可逆式机组背靠背启动振荡分析及对策

Analysis of oscillation in back-to-back starting process of 300 MW reversible pumped-storage unit and solutions

康永林 1张成平1

作者信息

  • 1. 中国长江三峡集团机电工程局,四川 成都610041
  • 折叠

摘要

Abstract

With the increasing capacity of the power grid, the reversible pumped-storage hydropower station as a special pow-er supply with the functions of load balancing, frequency regulation and phase modulation and emergency reserve demonstrates its advantages of flexibility and quick response in ensuring the safe, stable and economical operation of the power system. Back-to-back starting serves as a convenient, alternative way to start a reversible pumped-storage station when failures occur to the static frequency converter used in the normal starting mode. Based on a test of back-to-back starting in a large pumped-stor-age station, the dragging process of the units and the starting process of the dragged unit are explained. The problems in the drag-ging test are taken as an example, and the impacts of excitation, opening process of guide vanes and sub-synchronous over cur-rent protection on the staring process are analyzed. According to the field shakedown test and operation experience, directed solu-tions are proposed to meet the reliability index of the units.

关键词

背靠背启动/可逆式机组/控制流程/启动过程/振荡分析

Key words

back-to-back starting/reversible pumped-storage unit/control process/starting process/analysis of oscilla-tion