| 注册
首页|期刊导航|铁道标准设计|芜湖长江大桥常规检定评估试验

芜湖长江大桥常规检定评估试验

杨炯

铁道标准设计Issue(1):66-70,5.
铁道标准设计Issue(1):66-70,5.DOI:10.13238/j.issn.1004-2954.2016.01.014

芜湖长江大桥常规检定评估试验

Routine Evaluation Test of Wuhu Yangtze River Bridge

杨炯1

作者信息

  • 1. 上海铁路局工务处,上海 200071
  • 折叠

摘要

Abstract

The first routine evaluation test was conducted in 2014 for Wuhu Yangtze River Bridge to evaluate its safety conditions. Structural stress, deflection, bearing displacement, cable tension, vibration amplitude and frequency were tested. Test results show that the main truss’s stress, mid-span deflection, bearing displacement are basically consistent with the 2000 complete bridge experimental test results, the bridge structure is normal and at a elastic working stage. The tested dynamic coefficients of stress and deflection are both small and the vibration indicators ( transverse amplitude, horizontal amplitude, natural frequency and acceleration ) met the requirements related to bridge inspection regulations.

关键词

芜湖长江大桥/斜拉桥/检测

Key words

Wuhu Yangtze River Bridge/Cable-stayed bridge/Test

分类

交通工程

引用本文复制引用

杨炯..芜湖长江大桥常规检定评估试验[J].铁道标准设计,2016,(1):66-70,5.

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文