| 注册
首页|期刊导航|电力系统自动化|考虑电池组不一致性的储能系统建模及仿真

考虑电池组不一致性的储能系统建模及仿真

范刘洋 汪可友 张宝群 李国杰 翟登辉 王卫星

电力系统自动化Issue(3):110-115,6.
电力系统自动化Issue(3):110-115,6.DOI:10.7500/AEPS20150317015

考虑电池组不一致性的储能系统建模及仿真

Modeling and Simulation of Battery Energy Storage System Considering Intrinsic Inconsistency

范刘洋 1汪可友 1张宝群 2李国杰 1翟登辉 3王卫星3

作者信息

  • 1. 电力传输与功率变换控制教育部重点实验室,上海交通大学电子信息与电气工程学院,上海市 200240
  • 2. 国网北京市电力公司电力科学研究院,北京市 100085
  • 3. 许继集团有限公司,河南省许昌市 461000
  • 折叠

摘要

Abstract

The battery energy storage system (BESS) is considered an effective method for wind power stabilization.The inconsistency of BESS is always ignored in current simulations with the whole BESS simplified as a battery cell.However,in practice,because of the large scale of batteries,the cell to cell variation is quite common in BESS.In the circumstances,the simplified model would cause overcharge or discharge,which significantly shortens the lifetime of batteries.This paper discusses the deterioration of battery pack and develops a detailed Thevenin model for BESS with distinct inconsistency.The presented model is suitable for power electronic design and offers useful information for control strategy.The proposed model is applied to fluctuation stabilization of wind power to show its advantage over the simplified model.

关键词

电池储能系统/不一致性/风电波动/老化

Key words

battery energy storage system (BESS)/inconsistency/wind power fluctuation/deterioration

引用本文复制引用

范刘洋,汪可友,张宝群,李国杰,翟登辉,王卫星..考虑电池组不一致性的储能系统建模及仿真[J].电力系统自动化,2016,(3):110-115,6.

基金项目

国家高技术研究发展计划(863计划)资助项目(2014AA052003) (863计划)

国家自然科学基金资助项目(51307107,51477098) (51307107,51477098)

上海市科委资助项目(13231204002)。This work is supported by National High Technology Research and Development Program of China (863 Program)(No.2014AA052003) and National Natural Science Foundation of China(No.51307107,No.51477098) (13231204002)

电力系统自动化

OA北大核心CSCDCSTPCD

1000-1026

访问量0
|
下载量0
段落导航相关论文