人民长江2016,Vol.47Issue(2):59-61,71,4.DOI:10.16232/j.cnki.1001-4179.2016.02.014
TBM撑靴夹紧油缸损坏原因分析及应急修复
——以N-J水电工程为例
Casual analysis of clamp cylinder damage of TBM bracket boots and emergency repair:case of Neelum-Jhelum Hydroelectric Project
王西奎 1马以涛 1骆振华 1高敏1
作者信息
- 1. 中国葛洲坝集团 第三工程公司,陕西 西安710000
- 折叠
摘要
Abstract
In tunnel excavation of Neelum-Jhelum Hydroelectric Project by TBM, the clamp cylinder of TBM bracket boots was damaged. On the basis of analyzing the structural composition and working principle of TBM bracket boots, the bracket boot boots was disassembled and checked. It was found that the damage was mainly caused by the large angle deflection of the bracket boots, which made the clamp cylinder directly press on the cylinder bottom, resulting the inner screw thread pressed. Due to the shortage of the cylinder parts in construction site, unconventional repair mode was proposed by considering the whole project schedule. The arrangement of clamp cylinders less than normal numbers was introduced. The tunnling effect shows that the need for the angle adjustment can be guaranteed with the clamp cylinder reasonably arranged. The experience can be used for the re-pair work of similar engineering construction equipment.关键词
TBM/撑靴/夹紧油缸/修复方案/N-J水电工程Key words
TBM/bracket boots/clamp cylinder/repair scheme/Neelum-Jhelum Hydroelectric Project分类
能源科技引用本文复制引用
王西奎,马以涛,骆振华,高敏..TBM撑靴夹紧油缸损坏原因分析及应急修复
——以N-J水电工程为例[J].人民长江,2016,47(2):59-61,71,4.