| 注册
首页|期刊导航|铁道标准设计|长(沙)昆(明)客运专线轨道结构设计综述

长(沙)昆(明)客运专线轨道结构设计综述

伍卫凡

铁道标准设计Issue(2):7-10,11,5.
铁道标准设计Issue(2):7-10,11,5.DOI:10.13238/j.issn.1004-2954.2016.02.002

长(沙)昆(明)客运专线轨道结构设计综述

Design Summary of Track Structure of Changsha-Kunming Dedicated Passenger Line

伍卫凡1

作者信息

  • 1. 铁道第三勘察设计院集团有限公司,天津 300142
  • 折叠

摘要

Abstract

This paper summarizes the design of ballastless track structure of Changsha-Kunming dedicated passenger line, including CRTSⅠ double block ballastless track, CRTSII type slab track, transition section and the arrangement of rail expansion joint. With reference to the characteristics of Changsha-Kunming dedicated passenger line, the difficulties and key issues in the design of rail system are introduced to provide references for other similar projects. The form of ballastless track structure should be reasonably determined according to the types of substructure works and the track laying should be conducted in full sections. Railway lines in mountainous areas should adopt CRTSI double block ballastless track in order to reduce the quantity of rail temperature regulator. Large-span continuous beam sections may adopt CRTSIISlab track, and extra-long-span bridges should be provided with rail expansion joint. The ballastless track subgrade and transition section shall employ transitional measures.

关键词

长昆客运专线/无砟轨道/过渡段/钢轨伸缩调节器/设计

Key words

Changsha-Kunming dedicated passenger line/Ballastless track/Transition section/Rail expansion joint/Design

分类

交通工程

引用本文复制引用

伍卫凡..长(沙)昆(明)客运专线轨道结构设计综述[J].铁道标准设计,2016,(2):7-10,11,5.

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文