铁道标准设计Issue(3):11-15,5.DOI:10.13238/j.issn.1004-2954.2016.03.003
长昆客运专线(湖南段)综合选线设计研究
Comprehensive Route Selection Design for Changsha-Kunming Dedicated Passenger Railway Line (Hunan Section)
樊志敏1
作者信息
- 1. 铁道第三勘察设计院集团有限公司线站处,天津 300142
- 折叠
摘要
Abstract
Changsha-Kunming Dedicated Passenger Railway Line in Hunan is one part of Shanghai-Kunming dedicated passenger railway line in the domestic railway system of four east-west lines and four north-south lines. There are many environmental sensitive points along the line with complicated topographical and geological conditions and developed karst and ground water, which poses challenges to route selection. The analysis of some typical cases in route selection and the demonstration of construction and operation of Changsha-Kunming dedicated passenger railway line in Hunan prove that the route selection design satisfies the requirement of planning, serves to prevent major project risks, meet environmental requirements and make the project economical and reasonable. The proposed route selection design is expected to comply with the comprehensive concepts to address corridor network planning, functional positioning, environmental protection, geological and economic conditions and safety in construction and operation.关键词
长昆客运专线/线路方案/选线/理念Key words
Changsha-Kunming Dedicated Passenger Railway Line/Route scheme/Route selection/Concept分类
交通工程引用本文复制引用
樊志敏..长昆客运专线(湖南段)综合选线设计研究[J].铁道标准设计,2016,(3):11-15,5.