原子能科学技术Issue(1):131-136,6.DOI:10.7538/yzk.2016.50.01.0131
田湾核电站3、4号机组的长周期燃料管理
Long Cycle Fuel Management for TNPS Units 3 & 4
徐敏 1王红霞 1霍小东 1易璇 1于洋1
作者信息
- 1. 中国核电工程有限公司,北京 100840
- 折叠
摘要
Abstract
TNPS units 3 & 4 loaded TVS‐2M fuel assemblies from the first cycle with transiting from year fuel cycle to long fuel cycle .T he ow ners have advanced further re‐quirement about the length of cycle with 510 EFPD .Using KASKAD program package , the research on quick transition from year fuel cycle to long fuel cycle were carried out , and two long cycle fuel management cases were obtained .The important parameters of the two cases were analyzed , and all of the safety parameters meet the design requirements .The simple economic analysis of the equilibrium cycle was made also in this paper . T he results of the research have engineering application value and can be applied in TNPS units 3 & 4 and VVER‐1000 ,and can improve the economic efficiency of the plant .关键词
TVS-2M组件/VVER-1000/KASKAD/长周期燃料循环/燃料管理/经济性Key words
TVS-2M assembly/VVER-1000/KASKAD/long fuel cycle/fuel manage-ment/economical efficiency分类
能源科技引用本文复制引用
徐敏,王红霞,霍小东,易璇,于洋..田湾核电站3、4号机组的长周期燃料管理[J].原子能科学技术,2016,(1):131-136,6.