电力系统自动化Issue(5):54-61,70,9.DOI:10.7500/AEPS20150227001
基于混合多属性评价的错峰用电预案编制方法
A Hybrid Multiple-attribute Evaluation Based Scheduling Method for Peak Load Shifting
摘要
Abstract
It is necessary to interrupt power supply to less important users when the total power supply cannot meet the overall demand.Thus,an important issue to be addressed is how to properly prioritize users” electricity use,which is the so-called orderly power utilization ranking problem.Different users have different demanding characteristics,and the most suitable data description methods for these users may be different as well.With special emphasis on peak load shifting,a hybrid multiple attribute decision-making method based on mixed-data dominance is presented to solve the problem with various types of data to be handled in the orderly power utilization ranking problem.In the proposed method,the mixed-data dominance of each electricity user under a specified index is calculated and employed to identify the comprehensive closeness degree.The comprehensive weight of each index attained by taking into account both the objective and subjective weights can be used to calculate the weighted closeness degree of each electricity user,and hence to rank the sequence for orderly power utilization. Finally,a practical example is adopted for demonstrating the feasibility and features of the proposed method.关键词
有序用电/综合评价/混合占优/主观赋权/客观权重/贴近度Key words
orderly power utilization/comprehensive evaluation/mixed-data dominance/objective weight/subjective weight/closeness degree引用本文复制引用
王芃,福拴,王斐,姚林,马莉,李琨..基于混合多属性评价的错峰用电预案编制方法[J].电力系统自动化,2016,(5):54-61,70,9.基金项目
国家自然科学基金资助项目(51361130152,51477151) (51361130152,51477151)
国家电网公司科技项目(SGERI06KJ-201351) (SGERI06KJ-201351)
广州供电局有限公司科技项目(GZGD20140303250062)。This work is supported by National Natural Science Foundation of China (No.51361130152,No.51477151),a project from State Grid Corporation of China (No.SGERI06KJ-201351),and a project from Guangzhou Power Supply Bureau Co. Ltd.(No.GZGD20140303250062) (GZGD20140303250062)