| 注册
首页|期刊导航|计算机与数字工程|全寿命过程装备准备时间验证费用优选模型

全寿命过程装备准备时间验证费用优选模型

冯星 于永利 徐英 杨英杰

计算机与数字工程Issue(2):244-247,366,5.
计算机与数字工程Issue(2):244-247,366,5.DOI:10.3969/j.issn.1672-9722.2016.02.015

全寿命过程装备准备时间验证费用优选模型

Cost Optimization Model for Equipment Setup Time Demonstration in Life Cycle Process

冯星 1于永利 1徐英 1杨英杰1

作者信息

  • 1. 军械工程学院 石家庄 050003
  • 折叠

摘要

Abstract

In the engineering practice ,the equipment setup time demonstration in life cycle process is facing the problem of multiple choice difficulties .Aiming at these practical demands ,the resource requirements of different demonstration meth‐ods are proposed on the basis of comprehensive analysis the different characteristics of equipment technical state in each life stage and the demonstration methods ,then combining with demonstration practice ,the constraint parameters and the target parameters are analyzed and their relationship model is established .Numerical example shows that this relationship model can provide reference to demonstration method selecting of equipment setup time demands demonstration in life cycle process .

关键词

装备准备时间/验证方法/全寿命过程

Key words

equipment setup time/demonstration method/life cycle process

分类

管理科学

引用本文复制引用

冯星,于永利,徐英,杨英杰..全寿命过程装备准备时间验证费用优选模型[J].计算机与数字工程,2016,(2):244-247,366,5.

计算机与数字工程

OACSTPCD

1672-9722

访问量0
|
下载量0
段落导航相关论文