计算机与数字工程Issue(2):244-247,366,5.DOI:10.3969/j.issn.1672-9722.2016.02.015
全寿命过程装备准备时间验证费用优选模型
Cost Optimization Model for Equipment Setup Time Demonstration in Life Cycle Process
摘要
Abstract
In the engineering practice ,the equipment setup time demonstration in life cycle process is facing the problem of multiple choice difficulties .Aiming at these practical demands ,the resource requirements of different demonstration meth‐ods are proposed on the basis of comprehensive analysis the different characteristics of equipment technical state in each life stage and the demonstration methods ,then combining with demonstration practice ,the constraint parameters and the target parameters are analyzed and their relationship model is established .Numerical example shows that this relationship model can provide reference to demonstration method selecting of equipment setup time demands demonstration in life cycle process .关键词
装备准备时间/验证方法/全寿命过程Key words
equipment setup time/demonstration method/life cycle process分类
管理科学引用本文复制引用
冯星,于永利,徐英,杨英杰..全寿命过程装备准备时间验证费用优选模型[J].计算机与数字工程,2016,(2):244-247,366,5.