人民长江Issue(3):67-71,5.DOI:10.16232/j.cnki.1001-4179.2016.03.017
桃源水电站机组大件吊装技术与场地布置
Technology and site layout for hoisting and installation of large and heavy units of Taoyuan Hydropower Station
姜明忠 1潘军伟 2张占武 1吴潇1
作者信息
- 1. 中国水利水电第三工程局有限公司 制造安装分局,陕西 西安710032
- 2. 中国水电顾问集团 风电隆回有限公司,湖南 邵阳422200
- 折叠
摘要
Abstract
According to the design features of the powerhouses equipped with bulb tubular units of Taoyuan Hydropower Station and the limited site for hoisting and installing the large and heavy units, appropriate schemes for hoisting and installation and site layout in line with the actual conditions are proposed based on substantial analysis and calculation. The design and selection process of different schemes for hoisting and installing large and heavy units, and the technical difficulties and the arrangement of the work positions at the site are mainly introduced. Based on research and practice, a mature scheme and installation procedures capable of effectively shortening the installation duration are achieved, which can be popularized in the industry.关键词
贯流式机组/吊装技术/场地布置/桃源水电站Key words
bulb tubular units/hoisting and installation technologies/site layout/Taoyuan Hydropower Station分类
建筑与水利引用本文复制引用
姜明忠,潘军伟,张占武,吴潇..桃源水电站机组大件吊装技术与场地布置[J].人民长江,2016,(3):67-71,5.