摘要
Abstract
This paper introduces the monitoring method of the dam settlement, the inspection and comprehensive evaluation of the settlement instruments, ensures the authenticity and reliability of the monitoring data. Based on the analysis of the settlement data, the model of settlement deformation data is established by using the method of hierarchical transformation, electing influence factor and factor order, and using seismic special working conditions. So the data model is more consistent with the engineering characteristics, provides basis and mathematical model for monitoring and forecasting of Shuiniujia dam, and guides safe operation of the project.关键词
水牛家水电站/现场测试/沉降监测/影响因子Key words
Shuiniujia hydroelectricity station/spot test/subsidence monitor/influence factors分类
建筑与水利