| 注册
首页|期刊导航|西北水电|关于高水头压力钢管镇墩结构设计的初步探讨

关于高水头压力钢管镇墩结构设计的初步探讨

刘永智 师广山 张帆

西北水电Issue(1):27-32,6.
西北水电Issue(1):27-32,6.DOI:10.3969/j.issn.1006-2610.2016.01.007

关于高水头压力钢管镇墩结构设计的初步探讨

Study on Structural Design of A nchorage Block for Penstock with High Head

刘永智 1师广山 1张帆1

作者信息

  • 1. 中国电建集团西北勘测设计研究院有限公司,西安 710065
  • 折叠

摘要

Abstract

Abstratc:In recent years, lots of hydropower projects with high head come up in overseas design consultancy.Concerning rationality and e-conomy of the structural design of the anchorage block for the penstock, three alternatives (joint bearing, considering initial gap and addition-al bedding cushion) with the case of Delsi Hydropower Project in Ecuador are compared.By application of the finite element method and in combination with design specification for penstock of China and USA, reinforcement quantity, outline and construction difficulty of the an-chorage block each alternative are compared.A feasible solution is obtained.

关键词

高水头/镇墩/结构设计/加设垫层/经济性/德尔西水电站

Key words

high head/anchorage block/structural design/bedding cushion/economy/Delsi Hydropower Project

分类

建筑与水利

引用本文复制引用

刘永智,师广山,张帆..关于高水头压力钢管镇墩结构设计的初步探讨[J].西北水电,2016,(1):27-32,6.

西北水电

1006-2610

访问量0
|
下载量0
段落导航相关论文