赞比亚伊泰兹水电站厂房上游墙止推环结构应力分析

王红强

西北水电Issue(1):37-38,42,3.
西北水电Issue(1):37-38,42,3.DOI:10.3969/j.issn.1006-2610.2016.01.009

赞比亚伊泰兹水电站厂房上游墙止推环结构应力分析

Analysis on Structural Stress of Thrust Collar at Powerhouse Upstream Wall, Itezhi Hydropower Project

王红强1

作者信息

  • 1. 中国电建集团西北勘测设计研究院有限公司,西安 710065
  • 折叠

摘要

Abstract

By application of 3D finite element method, stresses of the thrust collar at powerhouse upstream wall and its surrounding concrete are calculated.Furthermore, their safety is assessed in accordance with structural stresses of the thrust collar and its neighboring penstock under the action of the unbalanced hydraulic thrust of the spiral case.The structural stress distribution of the concrete behind the thrust collar is referred to the reinforcement arrangement of the structure.

关键词

止推环/不平衡水推力/结构应力/伊泰兹水电站

Key words

thrust collar/unbalanced hydraulic thrust/structural stress

分类

建筑与水利