西北水电Issue(1):37-38,42,3.DOI:10.3969/j.issn.1006-2610.2016.01.009
赞比亚伊泰兹水电站厂房上游墙止推环结构应力分析
Analysis on Structural Stress of Thrust Collar at Powerhouse Upstream Wall, Itezhi Hydropower Project
王红强1
作者信息
- 1. 中国电建集团西北勘测设计研究院有限公司,西安 710065
- 折叠
摘要
Abstract
By application of 3D finite element method, stresses of the thrust collar at powerhouse upstream wall and its surrounding concrete are calculated.Furthermore, their safety is assessed in accordance with structural stresses of the thrust collar and its neighboring penstock under the action of the unbalanced hydraulic thrust of the spiral case.The structural stress distribution of the concrete behind the thrust collar is referred to the reinforcement arrangement of the structure.关键词
止推环/不平衡水推力/结构应力/伊泰兹水电站Key words
thrust collar/unbalanced hydraulic thrust/structural stress分类
建筑与水利引用本文复制引用
王红强..赞比亚伊泰兹水电站厂房上游墙止推环结构应力分析[J].西北水电,2016,(1):37-38,42,3.