新疆某水电站溢洪道台阶段水工模型试验研究

张鲁鲁

西北水电Issue(1):80-82,3.
西北水电Issue(1):80-82,3.DOI:10.3969/j.issn.1006-2610.2016.01.021

新疆某水电站溢洪道台阶段水工模型试验研究

Study on Hydraulic Model Tests on Step Section of Spillway

张鲁鲁1

作者信息

  • 1. 水利部新疆维水利水电勘测设计研究院,乌鲁木齐 830000
  • 折叠

摘要

Abstract

Through the spillway model establishment, the energy dissipation efficiency, aeration and flow pattern by steps with height of 0.65 m, 1.0 m and 1.3 m respectively are studied at different water level and in condition of the fixed step slope.The study presents that the ener-gy dissipation efficiency of the same step is inversely proportional with the discharge per unit width.The higher the discharge per unit width is, the weak the energy dissipation efficiency is.Regarding the different step height, the higher the step is, the higher the energy dissipation efficiency is.With increase of the aeration sills, the flow is aerated fully, the flow pattern is excellent, which can secure the safe and reliable operation of the step surface.

关键词

水工模型/溢洪道/台阶消能/掺气坎

Key words

hydraulic model/spillway/energy dissipation by step/aeration sill

分类

建筑与水利

引用本文复制引用

张鲁鲁..新疆某水电站溢洪道台阶段水工模型试验研究[J].西北水电,2016,(1):80-82,3.

西北水电

1006-2610

访问量0
|
下载量0
段落导航相关论文