| 注册
首页|期刊导航|广东电力|300 MW 循环流化床锅炉改烧低灰分褐煤试验研究

300 MW 循环流化床锅炉改烧低灰分褐煤试验研究

陈卓卫 孙超凡 洪喜彬 邓剑华 彭泽宏 李德波

广东电力2016,Vol.29Issue(1):17-21,5.
广东电力2016,Vol.29Issue(1):17-21,5.DOI:10.3969/j.issn.1007-290X.2016.01.004

300 MW 循环流化床锅炉改烧低灰分褐煤试验研究

Experimental Research on 300 MW Circulating Fluidized Bed Boiler Changing to Burn Low Ash Content Lignite

陈卓卫 1孙超凡 2洪喜彬 1邓剑华 2彭泽宏 2李德波2

作者信息

  • 1. 广东粤电集团云河发电有限公司,广东 云浮 527328
  • 2. 广东电网有限责任公司电力科学研究院,广东 广州 510080
  • 折叠

摘要

Abstract

In allusion to problems such as high bed temperature,uneven distribution of furnace temperature,insufficient cir-culating ash quantity of No.5 and No.6 boiler of Guangdong Yudean Group Cloud River Power Company Ltd.in the process of its changing to burn non-design coal Indonesia lignite,which seriously affect safe operation of the boiler,this research de-velops various combustion optimization experiments under different load working conditions in terms of adjusting grain diam-eter of furnace coal,air quantity of high pressure fluidizing air,total air quantity,matching of primary and secondary air, matching of up and down secondary air,bed pressure,and so on,which effectively solve a series of problems caused by the boiler changing to burn low ash content Indonesia lignite and make it have considerable economic benefit and broad prospect in application.

关键词

循环流化床锅炉/燃烧优化/风量/印尼褐煤/低灰分/非设计煤种

Key words

circulating fluidized bed boiler/combustion optimization/air quantity/Indonesia lignite/low ash content/non-design coal

分类

能源科技

引用本文复制引用

陈卓卫,孙超凡,洪喜彬,邓剑华,彭泽宏,李德波..300 MW 循环流化床锅炉改烧低灰分褐煤试验研究[J].广东电力,2016,29(1):17-21,5.

基金项目

中国南方电网有限责任公司科技项目(k-GD2013-0523) (k-GD2013-0523)

广东电力

OACSTPCD

1007-290X

访问量4
|
下载量0
段落导航相关论文