港工技术2016,Vol.53Issue(1):43-47,5.DOI:10.16403/j.cnki.ggjs20160110
茂名港博贺新港区防波堤工程防台措施设计
Design Research of Anti-typhoon Measures in Construction of Breakwater in Maoming Harbor Area of Bohe Port
高万国 1李梅 1李元音 1刘滨1
作者信息
- 1. 中交第一航务工程勘察设计院有限公司,天津 300222
- 折叠
摘要
Abstract
The breakwater in Maoming harbor area of Bohe port is consisted of revetment and allowable wave overtopping breakwater. Because the construction sequence has been changed, backfill material behind the revetment can’t be constructed in time, so the inner slop of revetment will be exposed to the open sea. Since the design condition has been changed, the structure type of inner slop will be different from the conventional structure. The project has experienced three typhoon processes. The reasons are summarized as follow: because of huge waves and typhoon surge, the top of breakwater is damaged during construction time. According to the characteristic of typhoon, making measures about top protection and inner slop protection, which are certain references to similar project.关键词
breakwater/typhoon surge/top protection/inner slop protectionKey words
breakwater/typhoon surge/top protection/inner slop protection分类
交通工程引用本文复制引用
高万国,李梅,李元音,刘滨..茂名港博贺新港区防波堤工程防台措施设计[J].港工技术,2016,53(1):43-47,5.