华安水电厂一号机组技术改造的探索与实践
Exploration and Practice of Technical Transformation of No.1 Generating-unit in Huaan Hydropower Station
黄立芹 1施国庆 2朱罗平2
作者信息
- 1. 华电福新能源股份有限公司 华安水力发电厂,福建 华安 363800
- 2. 华电电力科学研究院,浙江 杭州 310030
- 折叠
摘要
Abstract
Through the capacity expansion of No.1 generating-unit in Huaan hydropower plant, the flow passage wear, the unreliable leakage of main-shaft sealing, the leakage of main-spindle center air admission inlet and other prob-lems were solved. Combination appeared problems when No.1 generating-unit of Huaan Hydropower Station was technically transformed and corresponding solutions, key technologies and matters needing attention of hydropower generator units transformation were formulated, which will provide the reference for the future related projects.关键词
技术改造/主轴密封/主轴中心补气/调速器Key words
technical transformation/main-shaft seal/main-spindle center air admission/speed governor分类
通用工业技术引用本文复制引用
黄立芹,施国庆,朱罗平..华安水电厂一号机组技术改造的探索与实践[J].发电与空调,2016,(1):11-15,29,6.