QCC小组在石港泵站肘形进水流道施工中的应用
Application of QCC team in the construction of elbow inlet passage of Shigang pump station
徐铭 1李振华 2陆美凝 1马士磊 1高亮1
作者信息
- 1. 江苏省三河闸石港站加固改造工程建设处,江苏淮安 211600
- 2. 江苏省水利建设工程有限公司,江苏扬州 225009
- 折叠
摘要
Abstract
Passage is not only the key part,but also the most complicated and difficulty part of pump station. During the construction of Shigang pump station,the QCC team is set up by office managers,team leaders and backbones of construction group. Work goal is set,main and secondary factors of the goal are analyzed. Measures to solve the main factors are proposed. The progress of the project is accelerated effectively. The construction cost is saved at the same time.关键词
QCC小组/石港泵站/肘形进水流道Key words
QCC team/Shigang pump station/elbow inlet passage分类