南阳师范学院学报2016,Vol.15Issue(3):16-20,5.
长前导时间企业投入产出过程的建模与控制
Modeling and control of input-output process with long lead time
崔永良 1邢亮 2刘军1
作者信息
- 1. 莱芜职业技术学院 信息工程系,山东 莱芜271100
- 2. 莱钢集团矿山建设有限公司,山东 莱芜271100
- 折叠
摘要
Abstract
This paper investigates the influence of long lead time and the impact of exchange rate, price and mar-ket on the value of production factors. A new input-output model, which includes the factor of long lead time, is provided bases on Leontief input-output model. The stability is analyzed with the method of the stable theory. Fi-nally, the meaning of the stability is described.关键词
投入产出/Leontief模型/长前导时间Key words
input-output/leontief model/long lead time分类
信息技术与安全科学引用本文复制引用
崔永良,邢亮,刘军..长前导时间企业投入产出过程的建模与控制[J].南阳师范学院学报,2016,15(3):16-20,5.