铁道标准设计2016,Vol.60Issue(4):43-46,47,5.DOI:10.13238/j.issn.1004-2954.2016.04.011
高速铁路钢管混凝土系杆拱桥吊杆纠偏分析
Analysis on Rectification of Tied Concrete-filled Steel Tubular Arch Bridge on High-speed Railway
殷鹏程1
作者信息
- 1. 中铁第四勘察设计院集团有限公司,武汉 40063
- 折叠
摘要
Abstract
This paper discusses the cause and influence of the rectification of the tied concrete-filled steel tubular arch bridge suspender of high-speed railway and confirms the differences of suspender tensile forces measured in different periods. The finite element program MIDAS/Civil is used to establish the spatial finite element calculating models of the concrete filled steel tubular arch bridge and the measured suspender tensile force is used to define the corresponding state of the arch bridge by way of successive iterations. The influence of suspender rectification on the safety of bridge structure and train operation is analyzed and specific operation suggestions are offered. The calculating results can be used to guide suspender rectification of arch bridges and provide adoptable theories and practical references for the construction of similar bridges.关键词
高速铁路/系杆拱桥/吊杆/纠偏/监测索力/运营安全Key words
High-speed railway/Tied arch bridge/Suspender/Rectification/Measured suspender force/Safety of train operation分类
交通运输引用本文复制引用
殷鹏程..高速铁路钢管混凝土系杆拱桥吊杆纠偏分析[J].铁道标准设计,2016,60(4):43-46,47,5.