| 注册
首页|期刊导航|工程科学学报|基于主要目标法的堑沟底部结构位置优化

基于主要目标法的堑沟底部结构位置优化

刘洋 任凤玉 丁航行 宋德林 阚景文

工程科学学报2016,Vol.38Issue(3):314-319,6.
工程科学学报2016,Vol.38Issue(3):314-319,6.DOI:10.13374/j.issn2095-9389.2016.03.003

基于主要目标法的堑沟底部结构位置优化

Position optimization of trench bottom structure based on the main object method

刘洋 1任凤玉 1丁航行 1宋德林 1阚景文2

作者信息

  • 1. 东北大学资源与土木工程学院,沈阳110819
  • 2. 五矿邯邢矿业有限公司西石门铁矿,邯郸056303
  • 折叠

摘要

Abstract

This article aims at caving corner residual orebody by trench bottom structure in Xishimen Iron Mine. SURPAC software was used to calculate the ore volume, amount of metal and grade. A mathematical model of multi-objective optimization was established to maximize the amount of metal and grade. According to the special situation of corner residual orebody mining, the amount of metal was selected to be the main object. SURPAC software was developed to automatically calculate by using TCL script. With the help of the script software, all factors in the constraint were tested. The optimum position of trench bottom structure was obtained, which is on the 103. 1 m level and 18. 65 m to the orebody. Compared with the original design, the amount of metal is increased by 27. 79% after this optimal design.

关键词

铁矿山/采矿/堑沟挖掘/优化模型/回采

Key words

iron mines/mining/trench excavation/optimization models/stoping

分类

矿业与冶金

引用本文复制引用

刘洋,任凤玉,丁航行,宋德林,阚景文..基于主要目标法的堑沟底部结构位置优化[J].工程科学学报,2016,38(3):314-319,6.

基金项目

国家自然科学基金资助项目(51404065) (51404065)

“十二五”国家科技支撑计划资助项目(2013BAB02B08) (2013BAB02B08)

中央高校基本科研业务费资助项目(N140104008) (N140104008)

工程科学学报

OA北大核心CSCDCSTPCD

2095-9389

访问量0
|
下载量0
段落导航相关论文