湖北电力2016,Vol.40Issue(1):58-62,5.DOI:10.19308/j.hep.2016.01.012
电网建设项目经济效益后评价方法研究
Study on Post-evaluation Method of Economic Benefits for Power Grid Construction Project
万靖 1赖敏 2张威1
作者信息
- 1. 国网湖北省电力公司经济技术研究院,湖北 武汉 430077
- 2. 国网湖北省电力公司,湖北 武汉 430077
- 折叠
摘要
Abstract
Economic benefit evaluation is an important component of power grid construction proj⁃ect post-evaluation. Since social benefits of projects are not estimated in financial evaluation, bene⁃fit-cost analysis should be applied. Models for the benefits of the related grid and the costs of the individual project are proposed. Then the ratio of annual values of benefits and costs can be at⁃tained and economic evaluation can be completed accordingly. The proposed method can not only support power grid construction project post-evaluation technically for state grid Hubei electric pow⁃er company , but also provide references for other provinces.关键词
电网建设项目/经济效益/后评价Key words
power grid construction project/economic benefit/post-evaluation分类
经济学引用本文复制引用
万靖,赖敏,张威..电网建设项目经济效益后评价方法研究[J].湖北电力,2016,40(1):58-62,5.