| 注册
首页|期刊导航|电力系统自动化|网架重构过程中线路潮流越限消除的网络调整策略

网架重构过程中线路潮流越限消除的网络调整策略

顾雪平 董金哲 李少岩

电力系统自动化2016,Vol.40Issue(7):16-21,6.
电力系统自动化2016,Vol.40Issue(7):16-21,6.DOI:10.7500/AEPS20150706006

网架重构过程中线路潮流越限消除的网络调整策略

Network Adjustment Strategy for Eliminating Transmission Line Overload in Network Reconfiguration

顾雪平 1董金哲 1李少岩1

作者信息

  • 1. 华北电力大学电气与电子工程学院,河北省保定市 071003
  • 折叠

摘要

Abstract

During the process of network reconfiguration after blackouts,overloading of the restored transmission lines may occur due to pickup of a major load.An optimization control method is proposed by amending the network structure.For the overloaded lines,all the feasible paths that can mitigate the occurred overloading are found out from the unrestored network to constitute a set of optional paths.The optional paths are evaluated and ranked by the effect of subsequent recovery,over-load elimination,operating status,as well as the complexity of the recovery operation.The sorted path set can be the network adj ustment strategy for reducing the line overloading.The proposed network adj ustment strategy is validated by the simulation results on the IEEE 39-bus power system.

关键词

网架重构/潮流调整/评价指标/方案评估

Key words

network reconfiguration/power flow adjustment/evaluation indices/scheme evaluation

引用本文复制引用

顾雪平,董金哲,李少岩..网架重构过程中线路潮流越限消除的网络调整策略[J].电力系统自动化,2016,40(7):16-21,6.

基金项目

国家自然科学基金资助项目(51277076) (51277076)

中央高校基本科研业务费专项资金资助项目(2014XS75). This work is supported by National Natural Science Foundation of China (No.51277076) and Fundamental Research Funds for the Central Universities(No.2014XS75). (2014XS75)